Client: Rio Tinto Location: Yandi Mine Site, WA Practical Completion: June 2017 Contract Value: $2.3M
Rio Tinto engaged SX5 to detail earthworks to final levels, as well as design, engineer, manufacture and install Personnel Facilities at the Yandi Mine Site — namely, Crib / Office, Ablution and Locker Room facilities. We also designed, manufactured and installed a 5,000L per day Reverse Osmosis Water Treatment Plant, and supplied and installed a 54m Leach Drain Sewer System. Finally, our team installed site services networks and a remotely-monitored access gate.
Form of contract: AS4000 Type of contract: Lump Sum Start date: 02/02/2017 Date for Practical Completion: 30/06/2017 Date of Practical Completion: 30/06/2017 Actual contract period (weeks): 16 weeks