Client: Rio Tinto
Location: Yandi Mine Site, WA
Practical Completion: June 2017
Contract Value: $2.3M

Rio Tinto engaged SX5 to detail earthworks to final levels, as well as design, engineer, manufacture and install Personnel Facilities at the Yandi Mine Site — namely, Crib / Office, Ablution and Locker Room facilities. We also designed, manufactured and installed a 5,000L per day Reverse Osmosis Water Treatment Plant, and supplied and installed a 54m Leach Drain Sewer System. Finally, our team installed site services networks and a remotely-monitored access gate.

Form of contract: AS4000
Type of contract: Lump Sum
Start date: 02/02/2017
Date for Practical Completion: 30/06/2017
Date of Practical Completion: 30/06/2017