Client: Rio Tinto
Location: Yandi Mine Site, WA
Practical Completion: June 2017
Contract Value: $2.3M
Rio Tinto engaged SX5 to detail earthworks to final levels, as well as design, engineer, manufacture and install Personnel Facilities at the Yandi Mine Site — namely, Crib / Office, Ablution and Locker Room facilities. We also designed, manufactured and installed a 5,000L per day Reverse Osmosis Water Treatment Plant, and supplied and installed a 54m Leach Drain Sewer System. Finally, our team installed site services networks and a remotely-monitored access gate.
Form of contract: AS4000
Type of contract: Lump Sum
Start date: 02/02/2017
Date for Practical Completion: 30/06/2017
Date of Practical Completion: 30/06/2017
Actual contract period (weeks): 16 weeks
![](https://sx5group.com.au/wp-content/uploads/2022/08/SX5-Group-Yandi-Oxbow-Project.jpg)
![](https://sx5group.com.au/wp-content/uploads/2022/08/SX5-Group-Yandi-Oxbow-Project-2.jpg)
![](https://sx5group.com.au/wp-content/uploads/2022/08/SX5-Group-Yandi-Oxbow-Project3.jpg)
![](https://sx5group.com.au/wp-content/uploads/2022/08/SX5-Group-Yandi-Oxbow-Project4.jpg)
![](https://sx5group.com.au/wp-content/uploads/2022/08/SX5-Group-Yandi-Oxbow-Project5.jpg)
![](https://sx5group.com.au/wp-content/uploads/2022/08/SX5-Group-Yandi-Oxbow-Project6.jpg)